![eaton galileo licence eaton galileo licence](http://storage.electrika.com/flips/0266-eaton-ind-swgr-11-p4/files/assets/common/page-substrates/page0119.png)
This limitation does not extend to the easy-NET facility on the easy800 which is a completely separate feature, with its own dedicated RJ45 connectors on the top of the controller. However, as there is only one connector at the right hand end of the controller, only one of these options may be implemented. This limitation does not extend to the easy-NET fa.ĭigital I/O expansion and AS-i or Profibus DP network modules are available for easy600, 700, 800 and MFD-Titan controllers.
#Eaton galileo licence full
They offer many new features while retaining full backward compatibility and are available with 12Vdc, 24Vdc, 24Vac and 100-240Vac power supply/input voltage options for maximum user flexibility.ĭigital I/O expansion and AS-i or Profibus DP network modules are available for easy600, 700, 800 and MFD-Titan controllers.
![eaton galileo licence eaton galileo licence](https://buy.wesco.com/medias/sys_master/300WX300H/300WX300H/h69/h8d/9647854911518.jpg)
![eaton galileo licence eaton galileo licence](https://cdn1.idek.cz/argos_cz/img/product/-398307164_ew370_eh370.jpg)
The easy500 and 700 are enhanced versions of the easy 400 and 600. The easy family of logic controllers is available with a choice features and options making it suitable for a wide variety of applications including small to medium sized machine automation, HVAC, lighting and access control within buildings. It provides full functionality for the project designer at any time without any graduated.
#Eaton galileo licence software
With its non-sector specific concept, the visualisation software offers seamless project design for all XV/XP operator panels and all PC run-time solutions. Units with displays and panel keys can be programmed directly, or by using the software noted above, they can also display user configured messages (16 on the 500 and 700, and 32 on the 800) which include variable data fields.ġ6 multi-function timers, 16 up/down counters, (32 of each on the 800) and four retentive process run hour countersĬan be combined with MFD-Titan displays/controllersĭimensions: H 90mm x W 71.5mm x D 58mm (easy500) H 90mm x W 71.5mm x D 58mm (easy 700//800) Galileo is an intuitive, easy-to-learn yet powerful project design environment that fulfils almost all requirements of an on-site machine operation. Two 1kHz counter inputs on dc powered versions of the 500 and 700, (four 3/5kHz inputs on the 800)Īvailable as lower cost versions without display or panel keys (part numbers ending in X), for applications where no user interaction is required, and where the unit will be programmed using software which is available separately Two or four inputs on dc and 24Vac powered versions can be configured as 10 bit, 0-10V analogue
#Eaton galileo licence windows
Suitable for running under Windows NT 4.0, SP1, SP2, SP3, SP6, 2000, Vista, 7, 8 and XP While no copper mineralisation was found, one hole intersected a 6.32 metre interval of 2-5% fine-grained disseminated pyrite at the target horizon level which might represent a hydrothermal mineral system lateral to a copper occurrence, it said.Professional range of single or multi-user Eaton programming software. Galileo drilled in two of its retained licences, with most holes intersecting the target D'kar/Ngwako Pan Fm, where copper mineralisation has typically been found at previously discovered copper deposits in the KCB.
![eaton galileo licence eaton galileo licence](https://s1.manualzz.com/store/data/006473467_1-c64d0b2d8430f6be390bec3b78b5503e-360x466.png)
“We await with interest the assay results from the drill samples and the outcome of our ongoing drilling." “Results to date are very encouraging, with the limited drilling programme having already encountered copper mineralisation,” said Bird. Initial results bode well for our prospects of earning a deferred consideration and we look forward to results of further drilling by Sandfire on these licences.”ĭrilling on the Sandfire agreement licences intersected visible copper mineralisation at 242.7 metres and samples from this hole and other zones of interest will be sent for laboratory assay. “This intersection site is located within a licence block where Sandfire has a US$4mln exploration commitment over the following two years. "We are very pleased that drilling on the Sandfire agreement licences hit mineralisation of a type that can be associated with copper deposits on the KCB,” said Galileo chairman and chief executive Colin Bird. READ: Galileo Resources set to complete licence sale to Sandfire next week More than 5,000 metres of drilling has been completed to date on five of the KCB exploration licences, including Galileo’s retained licences and the Sandfire Resources Ltd agreement licences. 5', 2圎thernet, 2xUSB3.0, 1xRS232, 1xRS485, Galileo Runtime License, ATEX certification II 3D. Galileo Resources PLC (AIM:GLR) said it intercepted visible copper mineralisation on the Sandfire agreement licences at the Kalahari Copper Belt (KCB) project in western Botswana. Panel PC with capacitive multi-touch (PCT), 21.